Seaway Modification A First in North America Major modifications on three (3) Ro Ro class vessels were successfully completed in compliance with both the Panama Canal and St.Lawrence Seaway regulation
Bulbous Bow Repairs
Bulbous Bow Repairs A 140 000 GWT Bulk Carrier en-route to Sept-Iles, unknowingly collided with a growler (small iceberg) that caused major damage to it’s bulbous bow area. The repair required the ren
Bridge Window Installation
Bridge Window Installation Coming soon
Bow Damage “Prefabrication”
Bow Damage “Prefabrication” Emergency repairs were required on a General Cargo Ship that was damaged on the starboard bow shell plating upon its arrival at the Sorel dock. Our initial task was to perf
3D
3D Repairs were required on the starboard bulwark of a container ship which had been damaged in a storm. Measurements were required and taken on site with our High-Tech 3D Measuring Device, which allo